Guangdong Yitong Steel Pipe Industrial Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Yip Roy
  • Company Name : Guangdong Yitong Steel Pipe Industrial Co., Ltd.
  • Tel : 86-760-23886028
  • Fax : 86-760
  • Address : Guangdong,Zhongshan,Hongchang Industrial Park,Minzhong Road of Minzhong Town, Zhongshan City, Guangdong,China
  • Country/Region : China
  • Zip : 528441

Sample EMT

Sample EMT
Product Detailed
Related Categories:Steel Pipes
Steel conduit 1.Manufacturer Price 2.Heavy PG&HTG Surface Pipe 3.BSI Approval Pipe

Steel conduit

1.The steel pipe is formed with high quality welded tube and advanced galvanization technology and equipment. The galvanization layer is equally galvanized and smooth finished free from black spots and bubbles, strong corrosion resistance. Protect the wires perfectly in severe conditions like humidity, strong corronsion environment.

MOTTO:  Cable Safeguard Conduit

Advantages:

Zero spur, Cable safe ConduitPlain Seam, bendableHigh Zinc CoatingBSI,UL,TUV,GMC,ISO9001

EMT (Electrical Metallic Tube) UL797 ANSI C80.3

Nominal Diameter

Outside Diameter

Wall Thickness

Length[ft(±1/4in)][mm(±6mm)]

Minimum acceptable weight

Trade Size

Metric Designator

in.(mm)

Tolerance

in.(mm)

Tolerance

in.(mm)

lbs/ft

kg/m

1/2"

16

0.706(17.93)

±0.13mm

0.042(1.07)

+/-5%

 

10'(3050)

0.285

0.424

3/4"

21

0.922(23.42)

±0.13mm

0.049(1.24)

10'(3050)

0.435

0.647

1"

27

1.163(29.54)

±0.13mm

0.057(1.45)

10'(3050)

0.640

0.952

1-1/4"

35

1.510(38.35)

±0.13mm

0.065(1.65)

10'(3050)

0.950

1.414

1-1/2"

41

1.740(44.20)

±0.13mm

0.065(1.65)

10'(3050)

1.100

1.637

2"

53

2.197(55.80)

±0.13mm

0.065(1.65)

10'(3050)

1.400

2.083

2-1/2"

63

2.875(73.03)

±0.25mm

0.072(1.83)

10'(3050)

2.050

3.051

3"

78

3.500(88.90)

±0.38mm

0.072(1.83)

10'(3050)

2.500

3.720

3-1/2"

91

4.000(101.60)

±0.50mm

0.083(2.11)

10'(3050)

3.250

4.837

4"

103

4.500(114.30)

±0.50mm

0.083(2.11)

10'(3050)

3.700

5.506

Production Line

Comparison

YITONG  Conduit  VS  Regular Conduit

CERTIFICATES

           

PACKING DETAILS

Packing bag: White plastic bag, protect well the pipe from the wet air. 

         

Packing way: Hex packing 100pcs/bag or 10pcs/budle, 10bundles/bag round packing

        Packing string: Strong Plastic string for easy load and unload the goods, will put in the middle.     

MOQ: 20tons or one 20” container

Delivery: 15-25 working days

Payment: 30%deposit TT in advance, the balance need to pay before delivery.

Sample EMT



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.